{"id":22056,"date":"2023-02-22T07:52:07","date_gmt":"2023-02-22T06:52:07","guid":{"rendered":"https:\/\/www.mtec-systems.com\/?post_type=news&p=22056"},"modified":"2023-02-22T07:52:10","modified_gmt":"2023-02-22T06:52:10","slug":"the-m-tec-energy-balance-2022","status":"publish","type":"news","link":"https:\/\/www.mtec-systems.com\/en\/news\/the-m-tec-energy-balance-2022\/","title":{"rendered":"The M-TEC energy balance 2022"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

The M-TEC energy balance 2022<\/h1>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

M-TEC covers around 90% of its energy requirements from its own sustainable production<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"energy\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

Whether heat and electricity for the production hall or the office building or our own vehicle fleet – around 161,000 kWh of the 177,000 kWh were produced directly at the Pinsdorf site.<\/span><\/span> Only around 16,000 kWh had to be drawn from the grid to cover peaks.<\/span><\/span> This is a top value of over 90% self-sufficiency.<\/span><\/span><\/span><\/p>

Overall, however, much more energy was produced in Pinsdorf.<\/span><\/span> Around 305,000 kWh could be produced cleanly and sustainably via the existing PV system and hydroelectric power station.<\/span><\/span> That was around 15% more than the year before and resulted in a surplus of around 130,000 kWh.<\/span><\/span> Green electricity that could be fed into the grid.<\/span><\/span> The growing e-car fleet could also be supplied with around 60,000 kWh.<\/span><\/span><\/span><\/p>

As a producer of products and solutions for the production and management of energy, M-TEC shows at its own location how the energy transition can succeed.<\/span><\/span><\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t

\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

All data and facts from 2022<\/b>
at a glance<\/b><\/h1>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Generation
305.700 kWh<\/b><\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Usage
177.530 kWh<\/b><\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t

Grid feed
131.800 kWh<\/b><\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
    \n\t\t\t\t\t\t\t
  • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tHydro power: 263.000 kWh<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
  • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tPhotovoltaic: 42.700 kWh<\/b> <\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t
    \n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t
      \n\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tOffice\/Production: 85.00 kWh<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tHeat pumps: 34.130 kWh<\/b> <\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tE-mobility: 58.400 kWh<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
      \n\t\t\t\t
      \n\t\t\t\t\t\t\t
      \n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
      \n\t\t\t\t
      \n\t\t\t\t\t\t\t
        \n\t\t\t\t\t\t\t
      • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tGrid: 131.800 kWh<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
        \n\t\t\t\t\t\t
        \n\t\t\t\t\t
        \n\t\t\t
        \n\t\t\t\t\t\t
        \n\t\t\t\t
        \n\t\t\t\t\t\t\t
        \n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

        The M-TEC energy balance 2022 M-TEC covers around 90% of its energy requirements from its own sustainable production Whether heat and electricity for the production hall or the office building or our own vehicle fleet – around 161,000 kWh of the 177,000 kWh were produced directly at the Pinsdorf site. Only around 16,000 kWh had […]<\/p>\n","protected":false},"author":13,"featured_media":1292,"comment_status":"closed","ping_status":"closed","template":"","newskategorien":[1635],"class_list":["post-22056","news","type-news","status-publish","has-post-thumbnail","hentry","newskategorien-startseite-en"],"_links":{"self":[{"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/news\/22056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/comments?post=22056"}],"version-history":[{"count":1,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/news\/22056\/revisions"}],"predecessor-version":[{"id":22059,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/news\/22056\/revisions\/22059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/media\/1292"}],"wp:attachment":[{"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/media?parent=22056"}],"wp:term":[{"taxonomy":"newskategorien","embeddable":true,"href":"https:\/\/www.mtec-systems.com\/en\/wp-json\/wp\/v2\/newskategorien?post=22056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}